Powder Coating Production Line
Time of issue:
Sep 15,2025
Benchmark Cases: Powder Coating Production Line
1. High-Speed Train Bogie Coating System (CRRC)
· Extreme Temperature Resilience
Withstands -40℃~150℃ thermal cycling, exceeding railway operational limits
· Corrosion Resistance
1,200h salt spray durability (3× national standard GB/T 10125)
· Eco-Efficiency
Annual capacity: 150k units • 97% waste powder reclaim rate
2. Ship Section Coating Line (CSSC)
· Explosion-Proof Robotics
Processes 8m×4m mega-components with ATEX-certified manipulators
· Zero-VOC Ecosystem
Awarded 2024 Military Environmental Certification
· Cost-Effectiveness
40% faster coating • 60% labor cost reduction
3. EV Battery Housing Coating (CATL Supplier)
· Food-Safe Compliance
UL EC-2066/CE EN 71-3 certified coatings
· Battery Safety Tech
Electrostatic shielding ensures thermal runaway prevention
· Precision Manufacturing
800 pcs/day throughput • 99.2% yield rate
Customization Edge
| ▶ IoT & Big Data
Remote diagnostics + predictive maintenance
| ▶ Rapid Response
72h on-site emergency support
| ▶ Proven Delivery
427 lines deployed • 81% client repurchase rate
SHARE THIS: